Sheet 02Case studies

Notable works.

Works where the solution had to be worked out, not just a design carried out: the starting problem, the technique we chose and why, the figures and the result.

  1. 01 · Úbeda (Jaén) · 2026

    Emergency shoring of the roof of a historic theatre

    A storm left the long-span roof over the auditorium at risk of progressive collapse. We stabilised it with full shoring of modular falsework up to 12 m high, pending the permanent works.

    Ideal Cinema Theatre

  2. 02 · La Guardia de Jaén (Jaén) · 2025–2026

    Ground improvement under a residential building settling on expansive clays

    A building of 20 homes with two basements was cracking from differential settlement of more than 8 cm. We consolidated the ground beneath the footings with reinforced cement-grout injections, without touching the existing foundations.

    Mistral residential building

  3. 03 · Jaén · 2024

    Diverting the sewer beneath the future tunnel of a car park in the centre of Jaén

    To clear the way for the access tunnel to a car park, we renewed the street's sewer with two deep reinforced-concrete chambers, excavated within micropile walls below the water table.

    Calle San Clemente

  4. 04 · Jaén · 2025

    Ground improvement beneath the future foundations of five industrial units

    Before five industrial units were built on soft, expansive clays, we treated the ground with 299 cement-grout injections. Seismic tomography before and after recorded the improvement of the soil.

    Industrial units in Jaén

  5. 05 · Córdoba · 2025

    Ground consolidation beneath two occupied residential buildings

    Two blocks of flats showed damage from differential settlement. We consolidated the foundation soil with cement-grout injections and measured the improvement with cross-hole tests before and after.

    Residential buildings in Córdoba

  6. 06 · Jaén · 2022–2023

    Crossing beneath the tram tracks by horizontal directional drilling

    To take a new underground medium-voltage line to the far side of the roundabout, we crossed beneath the tram platform with a 114 m horizontal directional drilling, without opening a trench over the tracks.

    Plaza Jaén por la Paz

  7. 07 · Jaén · 2021–2022

    Underpinning and ground improvement beneath a parish church whose foundations were not as designed

    Cracks in the church and the parish house. Trial pits revealed that the piles in the 1981 design had never been built. We injected the ground beneath footings and ground beams, and confirmed the improvement with cross-hole tests.

    Santiago Apóstol parish

  8. 08 · Villanueva (Jaén) · 2017

    Bringing two electricity pylons back to vertical with hydraulic jacks

    Two pylons on an Endesa overhead medium-voltage line had tilted because of ground movement. We brought them back to vertical by pushing their footings with 55 t jacks against reinforced-concrete reaction beams.

    Medium-voltage line in Villanueva

  9. 09 · Espiel (Córdoba) · 2025–2026

    Civil works for an astronomy centre buried beneath a hill, with three circular courtyards

    Civil works for a 577 m² astronomy museum buried beneath a hill on the Llanos de Espiel. Concrete walls, load-bearing brickwork and three circular, conical courtyards under a green roof.

    Espiel Observatory and Astronomy Centre

  10. 10 · Alcalá del Río (Seville) · 2025–2026

    Underpinning the foundations of three terraced houses with micropiles

    Three terraced houses were cracking because the foundation at the end of the row had settled. We underpinned them from inside with 50 micropiles 15 m long and reinforced-concrete beams cast against the existing foundation.

    AVRA houses in Alcalá del Río

  11. 11 · Córdoba · 2026

    Repairing exposed concrete with corroded reinforcement, and the roofs, of two office buildings in use

    Two 1970s buildings whose exposed concrete was damaged by corrosion of the reinforcement. We are breaking out and repairing more than 1,000 m² with structural mortar and rebuilding the roofs with the buildings in use. Works in progress.

    Former Colegios Provinciales

  12. 12 · Martos (Jaén) · 2021

    Renewing the networks and laying granite paving in three streets of the historic quarter of Martos

    In three streets of the historic quarter of Martos, beside the Torre del Homenaje and the Torre Almedina, we renewed the sewers, the water supply and the street lighting and replaced the paving with granite setts and slabs.

    Surroundings of Martos castle

  13. 13 · Arjona (Jaén) · 2021–2022

    Remodelling a square in an archaeological reserve area, with trial trenches first, buried networks and the old cobbles kept

    We joined a plot used as a car park and the street next to it into a single square in the historic quarter of Arjona, with archaeological trial trenches first, the networks buried and the old cobbles kept.

    Plaza de San Martín and Paseo General Muñoz Cobo

  14. 14 · Jaén · 2023

    Repairing the valleys, lead flashings and gutters on the roof of a protected building

    The roof of the Camarín de Jesús, in the old town of Jaén, was letting water in through valleys, flashings and gutters. We repaired those points with zinc, lead and the salvaged tiles, from scaffolding and with rope access.

    Camarín de Jesús

  15. 15 · Baeza (Jaén) · 2023–2024

    Adapting and extending a house in the historic quarter of Baeza as a business centre

    A vernacular house sharing a party wall with Baeza Cathedral, of which only the façade walls remained. We kept them, restored its ashlar doorway and built the extension with hydraulic lime, antique tiles and local stone.

    Baeza Business Centre

  16. 16 · Arjonilla (Jaén) · 2023

    Replacing an asbestos-cement roof on a municipal market

    The roof of the municipal market was asbestos cement. It was removed under a work plan approved by the labour authority and we replaced it with 599 m² of tile-effect sandwich panel on galvanised purlins.

    Arjonilla municipal market